About Plate Mill

Plate Mill Profile 1990 LPN Plate Mill was established to produce and distribute hot rolled steel plates and hot rolled steel coils. 1993 The project of the plant construction phrase 1 was finished and first hot rolled steel plate produced with the overall capacity 400,000 tons per year. LPN Plate Mill Testing Laboratory was established to service in terms of international testing standards. 1995 Signing the contract to construct the plant phrase 1 for manufacturing hot rolled steel plates. 1996 LPN Plate Mill was converted into a public company. Signing the contract to construct the plant phrase 2 for manufacturing hot rolled steel coils. 1997 First hot-rolled coils produced. 1998 LPN PLATE MILL received ISO 9002 certificate. 2002 LPN PLATE MILL received Lloyd’s standards from Lloyd’s Register Quality Assurance Limited. 2003 LPN PLATE MILL received Certificate for Quality Assurance Program from ABS Quality Assurance Program. LPN Plate Mill obtains ISO/IEC 17025:1999 certification of laboratory accreditation. 2004 LPN PLATE MILL received ISO 14001 certificate. LPN PLATE MILL received ISO 18001 certificate. 2007 LPN Plate Mill received award for the Outstanding Energy Conservation Factory.

Read More

1 2 3 9